Springfield University Hospital
Clients
NHS Trust
Status
Completed
Building Type
Healthcare
Real PM’s Services
Phasing of the complete scheme
Overall strategic programming
Infrastructure
Procurement planning
Project Description
The Springfield University Hospital was at the centre of a 33-hectare estate regeneration. This included the urban design around the hospital as well as the planning and phasing of the surrounding residential development. The hospital consists of two distinct buildings and provides a range of mental health inpatient wards along with other outpatient services.
The build-out sequence of this redevelopment project was constrained by the requirement to keep the hospital operational at all times. As a result a detailed understanding of how the hospital operated was required to enable us to establish a logical construction and migration sequence.
Real PM’s Role
- Overall strategic programming and programme management
- Infrastructure programming and phasing
- Construction planning
- Involved in early-stage buildability and logistics support through the design phase up to planning